Construction of 2 blocks of 4 classes,2 blocks 40 bed dormitory,1 block kitchen and dining,chainlink perimeter fence,water drilling and supply,septic tanks and civil works,supply and installation of power backups

Open: 11 Mar, 2020

Close: 25 Mar, 2020

Select a Plan