Construction of the Mwenda Andu Water Supply: Drilling, Test Pumping Equipping and Solarization of One (1) Production Borehole, construction of a 100m³ Elevated Steel Tank, a Water Kiosk and Water Distribution Mains in Nyandarua County.

Open: 4 Nov, 2026 Close: 10 Nov, 2026
Borehole drilling and equipping Water Infrastructure
Select a Plan