Proposed Restoration (Stabilization of River Banks, Renovation of Existing Toilet, Walkways, Bridge and Fencing) of Nairobi River- Section from Museum Hill Interchange to Eastleigh First Avenue Bridge

Open: 29 Jan, 2019 Close: 15 Feb, 2019
Select a Plan